release: v0.1.4 signoff, changelog entry; carry remaining geometry to 0.1.5
- Review doc: all seven signoff items ticked (owner reviewed the local renders). - Screenshots README: per-shot Approved column, 4/4 approved 2026-11-09. - CHANGELOG: full 0.1.4 entry (kit, textures, materials, theatre trim, visual loop, the five placement/collision fixes, verified results, limitations). - TODO: 0.1.4 section removed; new 0.1.5 'Facade finishing' patch carries the retail neighbours (from their own references, not the theatre's), hero fluting and motto band, the blockout cleaning pass, and a 1440p performance re-measure with the kit in the map. - ROADMAP status updated.
This commit is contained in:
1 parent
040cdb6bd6
commit
d4a115a987
5 files changed
+173
-378
No files matched your search
@@ -16,14 +16,14 @@ Stages the demo shot cameras, runs the game on `/Game/Hollywood/DemoMap`, copies
|
||||
|
||||
Each shot has an **expectation** in [`Tools/visual_targets.json`](../Tools/visual_targets.json) — the content the capture must show — and a verification state produced by `--verify`: it fails if the frame is blank, the wrong size, or has no tonal range.
|
||||
|
||||
| # | File | View | Expected content | Verified |
|
||||
| --- | --- | --- | --- | --- |
|
||||
| 1 | `demo/review-demo-spawn-view.png` | north sidewalk | The whole south block: the neoclassical hero façade between its neighbours, both sidewalks and the road in the foreground | ☑ 2026-11-09 |
|
||||
| 2 | `demo/review-demo-street-level.png` | eye height, north side | Street level: the hero colonnade with the adjacent frontage buildings either side, shopfronts at pavement level | ☑ 2026-11-09 |
|
||||
| 3 | `demo/review-demo-crossing.png` | along the crosswalk | The designated mid-block crossing (s=130 m, UE X −14956): zebra bars on the asphalt, south frontage and colonnade behind | ☑ 2026-11-09 |
|
||||
| 4 | `demo/review-demo-north-buildings.png` | across the Boulevard | The two north-side buildings (TCL Chinese Theatre, Madame Tussaud's) from the south side, full height in frame | ☑ 2026-11-09 |
|
||||
| # | File | View | Expected content | Verified | Approved |
|
||||
| --- | --- | --- | --- | --- | --- |
|
||||
| 1 | `demo/review-demo-spawn-view.png` | north sidewalk | The whole south block: the neoclassical hero façade between its neighbours, both sidewalks and the road in the foreground | ☑ 2026-11-09 | ☑ 2026-11-09 |
|
||||
| 2 | `demo/review-demo-street-level.png` | eye height, north side | Street level: the hero colonnade with the adjacent frontage buildings either side, shopfronts at pavement level | ☑ 2026-11-09 | ☑ 2026-11-09 |
|
||||
| 3 | `demo/review-demo-crossing.png` | along the crosswalk | The designated mid-block crossing (s=130 m, UE X −14956): zebra bars on the asphalt, south frontage and colonnade behind | ☑ 2026-11-09 | ☑ 2026-11-09 |
|
||||
| 4 | `demo/review-demo-north-buildings.png` | across the Boulevard | The two north-side buildings (TCL Chinese Theatre, Madame Tussaud's) from the south side, full height in frame | ☑ 2026-11-09 | ☑ 2026-11-09 |
|
||||
|
||||
Approval is per shot, in the table above. Add a row when a shot is added; remove the file in the same change when a shot is retired.
|
||||
Approval is per shot, in the table above (owner review of the `0.1.4` set, recorded in [`Docs/reviews/0.1.4-review.md`](../Docs/reviews/0.1.4-review.md)). Add a row when a shot is added; remove the file in the same change when a shot is retired.
|
||||
|
||||
## The iteration loop (uncommitted)
|
||||
|
||||
|
||||
Reference in new issue
Block a user