fix(hero): lift the colonnade into the photographed 50-60% band
Measured from the built mesh, the colonnade (columns + capitals) was 6.90 m of the 14.50 m elevation = 47.6 %: the entablature (3.40 m) and parapet (2.20 m) were using 5.60 m of the height. Thinned both to 3.00 m and 1.80 m in hero_facade_build.py, which lifts the colonnade to 7.70 m = 53.1 % - inside the 50-60 % band - with the envelope, motto band and medallions unchanged relative to the parapet. Hero rebuilt, re-imported (bounds 2604 x 1257 x 1450 cm), DemoMap rebuilt and the screenshot set re-rendered for review. Hero part report updated (columns 7.45 -> 8.25 m, entablature 3.40 -> 3.00 m). TODO: colonnade item closed. MEMORY records the FBX-vs-blend --out gotcha.
This commit is contained in:
1 parent
640bff9631
commit
8851b2272e
30 files changed
+70
-48
No files matched your search
@@ -50,8 +50,12 @@ FRONTAGE_Y = 0.0 # front plane sits at the building line of the block fra
|
||||
PEDESTAL_H = 1.45 # column pedestal top; entrance platform sits on it
|
||||
COLUMN_D = 0.95 # Ionic shaft diameter at the base
|
||||
CAPITAL_H = 0.95
|
||||
ENTABLATURE_H = 3.40 # band between the capitals and the motto panel
|
||||
PARAPET_H = 2.20 # motto panel and cornice above the entablature
|
||||
ENTABLATURE_H = 3.00 # band between the capitals and the motto panel
|
||||
# 3.40 -> 3.00 on 2026-11-09: the photographs put the
|
||||
# colonnade at 50-60 % of the 14.5 m elevation, and our
|
||||
# 3.40/2.20 entablature+parapet left it at 47.6 %. Thinning
|
||||
# both lifts the colonnade to 7.70 m = 53.1 %, inside the band.
|
||||
PARAPET_H = 1.80 # motto panel and cornice above the entablature (see above)
|
||||
PORTAL_W = 3.10 # each of the three door openings
|
||||
PORTAL_H = 3.40
|
||||
STEP_TREAD = 0.34
|
||||
|
||||
Reference in new issue
Block a user