fix(hero): lift the colonnade into the photographed 50-60% band

Measured from the built mesh, the colonnade (columns + capitals) was 6.90 m of the
14.50 m elevation = 47.6 %: the entablature (3.40 m) and parapet (2.20 m) were
using 5.60 m of the height. Thinned both to 3.00 m and 1.80 m in
hero_facade_build.py, which lifts the colonnade to 7.70 m = 53.1 % - inside the
50-60 % band - with the envelope, motto band and medallions unchanged relative to
the parapet.

Hero rebuilt, re-imported (bounds 2604 x 1257 x 1450 cm), DemoMap rebuilt and the
screenshot set re-rendered for review. Hero part report updated (columns 7.45 ->
8.25 m, entablature 3.40 -> 3.00 m).

TODO: colonnade item closed. MEMORY records the FBX-vs-blend --out gotcha.
This commit is contained in:
zwitschi committed 2026-11-08 16:46:30 +01:00
1 parent 640bff9631
commit 8851b2272e
30 files changed
+70 -48

No files matched your search

+6 -2
View File
@@ -50,8 +50,12 @@ FRONTAGE_Y = 0.0 # front plane sits at the building line of the block fra
PEDESTAL_H = 1.45 # column pedestal top; entrance platform sits on it
COLUMN_D = 0.95 # Ionic shaft diameter at the base
CAPITAL_H = 0.95
ENTABLATURE_H = 3.40 # band between the capitals and the motto panel
PARAPET_H = 2.20 # motto panel and cornice above the entablature
ENTABLATURE_H = 3.00 # band between the capitals and the motto panel
# 3.40 -> 3.00 on 2026-11-09: the photographs put the
# colonnade at 50-60 % of the 14.5 m elevation, and our
# 3.40/2.20 entablature+parapet left it at 47.6 %. Thinning
# both lifts the colonnade to 7.70 m = 53.1 %, inside the band.
PARAPET_H = 1.80 # motto panel and cornice above the entablature (see above)
PORTAL_W = 3.10 # each of the three door openings
PORTAL_H = 3.40
STEP_TREAD = 0.34