fix(hero): lift the colonnade into the photographed 50-60% band

Measured from the built mesh, the colonnade (columns + capitals) was 6.90 m of the
14.50 m elevation = 47.6 %: the entablature (3.40 m) and parapet (2.20 m) were
using 5.60 m of the height. Thinned both to 3.00 m and 1.80 m in
hero_facade_build.py, which lifts the colonnade to 7.70 m = 53.1 % - inside the
50-60 % band - with the envelope, motto band and medallions unchanged relative to
the parapet.

Hero rebuilt, re-imported (bounds 2604 x 1257 x 1450 cm), DemoMap rebuilt and the
screenshot set re-rendered for review. Hero part report updated (columns 7.45 ->
8.25 m, entablature 3.40 -> 3.00 m).

TODO: colonnade item closed. MEMORY records the FBX-vs-blend --out gotcha.
This commit is contained in:
zwitschi committed 2026-11-08 16:46:30 +01:00
1 parent 640bff9631
commit 8851b2272e
30 files changed
+70 -48

No files matched your search

Binary file not shown.
Binary file not shown.
Binary file not shown.
Binary file not shown.
Binary file not shown.
Binary file not shown.
Binary file not shown.
Binary file not shown.
Binary file not shown.
Binary file not shown.
Binary file not shown.
Binary file not shown.
Binary file not shown.
Binary file not shown.