fix(hero): lift the colonnade into the photographed 50-60% band
Measured from the built mesh, the colonnade (columns + capitals) was 6.90 m of the 14.50 m elevation = 47.6 %: the entablature (3.40 m) and parapet (2.20 m) were using 5.60 m of the height. Thinned both to 3.00 m and 1.80 m in hero_facade_build.py, which lifts the colonnade to 7.70 m = 53.1 % - inside the 50-60 % band - with the envelope, motto band and medallions unchanged relative to the parapet. Hero rebuilt, re-imported (bounds 2604 x 1257 x 1450 cm), DemoMap rebuilt and the screenshot set re-rendered for review. Hero part report updated (columns 7.45 -> 8.25 m, entablature 3.40 -> 3.00 m). TODO: colonnade item closed. MEMORY records the FBX-vs-blend --out gotcha.
This commit is contained in:
1 parent
640bff9631
commit
8851b2272e
30 files changed
+70
-48
No files matched your search
Binary file not shown.
Binary file not shown.
Binary file not shown.
Binary file not shown.
Binary file not shown.
Binary file not shown.
Binary file not shown.
Binary file not shown.
Binary file not shown.
Binary file not shown.
Binary file not shown.
Reference in new issue
Block a user