fix(hero): lift the colonnade into the photographed 50-60% band
Measured from the built mesh, the colonnade (columns + capitals) was 6.90 m of the 14.50 m elevation = 47.6 %: the entablature (3.40 m) and parapet (2.20 m) were using 5.60 m of the height. Thinned both to 3.00 m and 1.80 m in hero_facade_build.py, which lifts the colonnade to 7.70 m = 53.1 % - inside the 50-60 % band - with the envelope, motto band and medallions unchanged relative to the parapet. Hero rebuilt, re-imported (bounds 2604 x 1257 x 1450 cm), DemoMap rebuilt and the screenshot set re-rendered for review. Hero part report updated (columns 7.45 -> 8.25 m, entablature 3.40 -> 3.00 m). TODO: colonnade item closed. MEMORY records the FBX-vs-blend --out gotcha.
This commit is contained in:
1 parent
640bff9631
commit
8851b2272e
30 files changed
+70
-48
No files matched your search
Binary file not shown.
@@ -33,7 +33,7 @@
|
||||
"dims_m": [
|
||||
0.95,
|
||||
0.95,
|
||||
7.45
|
||||
8.25
|
||||
],
|
||||
"evidence": "6 columns at 4.96 m centres (sibling notes x measured frontage)"
|
||||
},
|
||||
@@ -60,7 +60,7 @@
|
||||
"dims_m": [
|
||||
25.75,
|
||||
1.5,
|
||||
3.4
|
||||
3.0
|
||||
],
|
||||
"evidence": "assumption: entablature depth"
|
||||
},
|
||||
@@ -69,7 +69,7 @@
|
||||
"dims_m": [
|
||||
25.75,
|
||||
1.2,
|
||||
2.2
|
||||
1.8
|
||||
],
|
||||
"evidence": "assumption: parapet carries the motto band"
|
||||
},
|
||||
|
||||
Reference in new issue
Block a user