-
v0.1.1 — collision fixes
released this
2026-11-08 16:19:30 +01:00 Sidewalk outer ledge removed (upstand tapers to flush at the building edge) and
crossing ramps graded to 8% max (1.63 m run). Pre-check now reports grade and
location of the worst step. Verified on the packaged build: transect 1456
samples / 0 holes, wall probe 0/35, walk/reset/pause PASS.Downloads