fix(street): taper sidewalk upstand to flush at the building edge
The sidewalk stood the full 0.15 m kerb height above the DEM at *both* edges, so the outer (building-side) lip was a 15.8 cm ledge where the walk route crossed from Terrain_DEM onto Sidewalk_South. sidewalk_z now tapers the upstand from full at the road-side edge to zero at the building-side edge (a ~3-4 % ramp, walkable and visually negligible). Pre-check: south max step 20.5 -> 13.4 cm, north 15.1 -> 7.2 cm (the residual 13.4 cm is the crossing-ramp gradient, tracked separately). Street and site rebuilt, site re-imported (7/7 meshes, collision flags intact), DemoMap rebuilt; packaged -qaselftest still PASS. README step table updated.
This commit is contained in:
1 parent
115612e7e8
commit
eab89bae47
21 files changed
+61
-36
No files matched your search
Binary file not shown.
Binary file not shown.
Binary file not shown.
Binary file not shown.
Binary file not shown.
Binary file not shown.
Binary file not shown.
Binary file not shown.
Binary file not shown.
Binary file not shown.
Binary file not shown.
Binary file not shown.
Binary file not shown.
Binary file not shown.
Binary file not shown.
Reference in new issue
Block a user