fix(street): taper sidewalk upstand to flush at the building edge

The sidewalk stood the full 0.15 m kerb height above the DEM at *both* edges, so
the outer (building-side) lip was a 15.8 cm ledge where the walk route crossed
from Terrain_DEM onto Sidewalk_South. sidewalk_z now tapers the upstand from full
at the road-side edge to zero at the building-side edge (a ~3-4 % ramp, walkable
and visually negligible).

Pre-check: south max step 20.5 -> 13.4 cm, north 15.1 -> 7.2 cm (the residual
13.4 cm is the crossing-ramp gradient, tracked separately). Street and site
rebuilt, site re-imported (7/7 meshes, collision flags intact), DemoMap rebuilt;
packaged -qaselftest still PASS. README step table updated.
This commit is contained in:
zwitschi committed 2026-11-08 16:12:46 +01:00
1 parent 115612e7e8
commit eab89bae47
21 files changed
+61 -36

No files matched your search

+6 -5
View File
@@ -1,8 +1,9 @@
# Gig Line Architecture Documentation
> Linux-first walking/driving demo around 6840 Hollywood Blvd
Version 0.1.0 — 2026-11-08 — initial architecture documentation
---
title: Gig Line Architecture Documentation
description: Architecture documentation for the Gig Line Linux-first Unreal Engine 5 demo around 6840 Hollywood Blvd.
status: v0.1.0
date: 2026-11-08
---
# Introduction and Goals