hero: make the portals real recesses and land the facade on Z 0

The portal detail shot failed for a modelling reason, not a camera reason: the
doors were 0.1 m panels on a solid plinth, so they read as shading. The plinth is
now four piers plus a lintel band, with a 1.2 m reveal, stone jambs and lintels
standing 0.10 m proud and three mullions per opening. review-06 frames them from
8 m at eye height.

Two defects fixed while doing it: the jamb boxes hung 0.15 m below the pavement,
so the facade imported with min Z -15 cm; and a rebuild run against a read-only
.blend silently skipped the save, which is why screenshots kept showing the old
geometry.
This commit is contained in:
zwitschi committed 2026-11-07 12:46:00 +01:00
1 parent f575bc82a8
commit d4af4af90f
22 files changed
+132 -55

No files matched your search

+5 -3
View File
@@ -75,11 +75,13 @@ Low camera, knee height, close on the mannequin's feet. A floating or sinking ch
Low angle, both cubes side by side with the character between them. The detached shadow of the floating cube against the grounded one.
## review-06-hero-portals.png — Hero façade, whole elevation, approval: ☐ pending
## review-06-hero-portals.png — Hero façade portals, approval: ☐ pending
![Hero façade, whole elevation](review-06-hero-portals.png)
![Hero façade portals](review-06-hero-portals.png)
Straight-on from eye height 25 m out. Six columns, plinth, entablature, parapet; the three portals sit behind the colonnade at this distance.
New: generated 2026-11-07 after the portals were rebuilt. Eye height at 8 m, filling the frame with the three doorways, their flights, and the plinth. The doors are now genuine 1.2 m recesses cut through four plinth piers, with stone jambs and lintels standing proud and three mullions in each opening.
What this shot is evidence for: that the entrance is three separate openings with individual flights (not the inherited "eight steps, 12 m wide"), and that the facade stands on Z 0 rather than sinking into the ground.
## review-07-hero-facade-front.png — Hero façade, north sidewalk, approval: ☐ pending