Retire the NPC review pages after owner acceptance and repoint every reference
Full build / Import + headless tests (push) Successful in 50s
Full build / Full desktop build + optional release (push) Skipped

This commit is contained in:
zwitschi committed 2026-11-06 18:37:17 +01:00
1 parent d5e180e50c
commit fcbeee0db2
25 files changed
+53 -221

No files matched your search

+4 -4
View File
@@ -5,10 +5,10 @@ Status: **baseline measured; scorecard open.** This is the working document for
Blender skill guidance says the targets are, the ranked candidate gaps, and the decisions that
still need the project owner. Nothing here re-opens the accepted 0.9.4 limits by itself.
Related documents: [`npc-visual-review.md`](npc-visual-review.md) (accepted 0.9.4 limits and
before/after sheets), [`npc-visual-review.md`](npc-visual-review.md#proportion-audit) (proportion guide),
[`blender-assets.md`](blender-assets.md) (asset contract), [`asset-tooling.md`](asset-tooling.md)
(commands).
Related documents: [`npc-model-sourcing.md`](npc-model-sourcing.md) (sources, shipped roster and
build steps), [`blender-assets.md`](blender-assets.md) (asset contract),
[`asset-tooling.md`](asset-tooling.md) (commands). The 0.9.4 procedural baseline this page was
measured against no longer ships; its before/after sheets stay in `blender_previews/`.
## Method and skill routing