@@ -8,6 +8,7 @@
- [Production Target (Hetzner)](#production-target-hetzner)
- [Planned Infrastructure](#planned-infrastructure)
- [Cutover Plan](#cutover-plan)
- [Production Preflight](#production-preflight)
- [Firewall / Security Group](#firewall--security-group)
- [Pipeline Readiness](#pipeline-readiness)
- [Target Topology](#target-topology)
@@ -64,6 +65,19 @@ Linear Void runs in two separate environments:
6. Enable HTTPS, WAF, cache rules on production zone
7. Decommission test lab as public target
### Production Preflight
Before the cutover in the plan above, treat the following as the minimum readiness gate:
1. Verify the Hetzner host is reachable over SSH and Docker remote API TLS is working for the Gitea runner.
2. Confirm all required production secrets are present under the `CI_PROD_*` prefix.
3. Confirm `linearvoid.tv`, `www.linearvoid.tv`, and `media.linearvoid.tv` DNS targets are correct for the intended phase.
4. Complete the manual Cloudflare/UptimeRobot checklist and attach evidence in `docs/operations/cloudflare-uptimerobot-checklist.md`.
5. Run the production smoke path end to end: viewer SPA, HLS playback, chat connect, admin login, upload, playlist save, and playout health.
6. Verify rollback is still possible before the final DNS switch.
Readiness is not complete until the checklist above and the manual evidence tracker are both satisfied.
### Firewall / Security Group
| Port | Source | Purpose |