feat: add metrics, observability, test fixtures, and scaling playbook artifacts
This commit is contained in:
1 parent
926a663c23
commit
f9aba11b90
32 files changed
+1788
-124
No files matched your search
@@ -8,6 +8,7 @@
|
||||
- [Production Target (Hetzner)](#production-target-hetzner)
|
||||
- [Planned Infrastructure](#planned-infrastructure)
|
||||
- [Cutover Plan](#cutover-plan)
|
||||
- [Production Preflight](#production-preflight)
|
||||
- [Firewall / Security Group](#firewall--security-group)
|
||||
- [Pipeline Readiness](#pipeline-readiness)
|
||||
- [Target Topology](#target-topology)
|
||||
@@ -64,6 +65,19 @@ Linear Void runs in two separate environments:
|
||||
6. Enable HTTPS, WAF, cache rules on production zone
|
||||
7. Decommission test lab as public target
|
||||
|
||||
### Production Preflight
|
||||
|
||||
Before the cutover in the plan above, treat the following as the minimum readiness gate:
|
||||
|
||||
1. Verify the Hetzner host is reachable over SSH and Docker remote API TLS is working for the Gitea runner.
|
||||
2. Confirm all required production secrets are present under the `CI_PROD_*` prefix.
|
||||
3. Confirm `linearvoid.tv`, `www.linearvoid.tv`, and `media.linearvoid.tv` DNS targets are correct for the intended phase.
|
||||
4. Complete the manual Cloudflare/UptimeRobot checklist and attach evidence in `docs/operations/cloudflare-uptimerobot-checklist.md`.
|
||||
5. Run the production smoke path end to end: viewer SPA, HLS playback, chat connect, admin login, upload, playlist save, and playout health.
|
||||
6. Verify rollback is still possible before the final DNS switch.
|
||||
|
||||
Readiness is not complete until the checklist above and the manual evidence tracker are both satisfied.
|
||||
|
||||