diff --git a/Geo/verification/2026-11-06-el-capitan-block.md b/Geo/verification/2026-11-06-el-capitan-block.md index ecd6c0c..4dedbc6 100644 --- a/Geo/verification/2026-11-06-el-capitan-block.md +++ b/Geo/verification/2026-11-06-el-capitan-block.md @@ -89,6 +89,6 @@ Excluded and why: `6780` (Bank of America) and everything east of it is east of - **Crossing location.** No marked crossing geometry confirmed yet, and `0.1.0` requires one designated crossing. - **Elevation.** No DEM checked. The choice between using a separately licensed DEM and skipping it depends on measured height variation across the 279 m block. - **North-side reference photography.** Both north-side buildings are in scope and neither appears in the reference set. They cannot be detailed from evidence yet. -- **Façade width conflict.** 29.6 m from the sibling project's venue notes against the 25.7 m OSM bbox; recorded in [`../../Art/reference/hollywood/NOTES.md`](../../Art/reference/hollywood/NOTES.md) and unresolved. +- **Façade width conflict.** 29.6 m from the sibling project's venue notes against the 25.7 m OSM bbox; recorded in [`../../Docs/reference-notes-hollywood.md`](../../Docs/reference-notes-hollywood.md) and unresolved. Next: measure roadway and sidewalk widths, fix the local CRS and origin, and resolve the façade-width conflict before any façade modelling.